نحن جاهزون للتواصل!

Case Studies > Bonaprene
Manufacturing United Kingdom

Bonaprene Case Study

Strengthening industrial sustainability and eliminating latent out-of-hours factory equipment waste.

Introducing Bonaprene

Bonaprene, a leading UK polyurethane manufacturer serving the industrial, automotive, and aeronautical sectors, wanted to reduce energy consumption and strengthen its sustainability performance without affecting production output. The factory was experiencing several areas of hidden energy waste, including heating equipment operating longer than required, machines running outside production hours, and energy-intensive equipment operating at full capacity despite changing production demand.

The Challenges

Out-of-Hours Running

Industrial curing ovens and heating cycles left active overnight and outside shifts due to lack of visibility.

High Idle baseloads

Inductive machinery idling during workflow changeovers creating silent, massive energy penalties.

Hype vs. Hard Data

Struggling to track exact per-machine return on sustainability investments without localized metering.

The IoTech Solution

Through a Best.Energy partner, Eniscope was installed across two production lines to provide real-time energy data and 24/7 analysis of individual machinery.

  • 01 Asset-level monitoring of high-draw industrial curing ovens.
  • 02 Scheduling optimizations mapping out shifts to match efficient energy rates.
  • 03 Staff engagement tools showcasing live floor metrics to drive operational hygiene.

Key Outcomes

01

30% Energy Savings Identified

Immediate visual mapping showed massive, low-cost avenues for operational efficiency.

02

Over £20,000 Annual Savings

Significant reduction in overall manufacturing overhead translating to a healthier bottom line.

03

24/7 Machine-Level Analytics

Established discrete asset tracking across two primary heavy industrial production zones.

04

Real-Time Operational Mapping

Allowed plant operators to spot scheduling errors instantly on the live cloud portal.

05

Out-of-Hours Cleanup

Stopped multi-circuit overnight idling wastage by enforcing clear automated shut-offs.

06

5x Return on Investment

Ongoing savings verified at five times the cost of hardware and monitoring services.

Project Conclusion

By using granular energy data to improve operating schedules, equipment settings, and production processes, Bonaprene was able to identify and reduce unnecessary energy consumption.

Download the Full Case Study

Fill in your details to receive the complete report as a PDF.

By using this form you agree to terms of use.

Want to identify energy waste across your sites?

Book a free consultation with IoTech Energy and see how real-time monitoring can
support better visibility, lower waste, and measurable savings.

Contact us